Industrial production building (meat processing facility). Commissioned in 2002. The property is sold together with land of approximately 1.5 ha. According to the spatial (zoning) plan – industrial development area. Two deep water boreholes (One PVD), local sewage system, and wastewater treatment facilities. Temporary electricity connection from the common area. The condition of the building’s interior is shown in the images; additional investment will be required to start production. Located close to national roads A2 and A3. Access to the property is via an asphalted road.
Iela: Pērkoni
Nepieciešami kontakti vai vairāk informācijas?